siren0119
DIS Veteran
- Joined
- Sep 26, 2018
You could be right, but the verbiage of later this year builds in enough ambiguity to keep the public in suspense.
What I would have tabled in the concept/design phase is a mode B option should the technical team(s) encounter delays; they built it into Navi River Journey with the animinatronic. Use the mode B to hit your release date, while continually working/testing the primary mode A. Maybe they already have this incorporated into the attraction?
Based on what I've heard about RotR, comparing it with Nav'i (in terms of A and B mode) is apples and oranges. A mode in Nav'i is the animatronic while B mode is the shaman on a projection. The VR element and interactive response from the program aren't something you can easily swap out.