2.0 Project Site Description
The 5.70 acre project in Epcot consists of adding impervious surface. Stormwater from the site
discharges through existing conveyance pipe to the RCID Epcot Master Drainage System.
3.0 Proposed Project
This project proposes additional impervious surface. Stormwater treatment will be provided by the
construction of two new dry detention ponds that outlet to the RCID EPCOT
http://my.sfwmd.gov/entsb/docdownload?object_id=0900eeea89b856f9
Still reading through it...
2.0 Project Site Description
The 5.70 acre project in Epcot consists of adding impervious surface. Stormwater from the site
discharges through existing conveyance pipe to the RCID Epcot Master Drainage System.
3.0 Proposed Project
This project proposes additional impervious surface. Stormwater treatment will be provided by the
construction of two new dry detention ponds that outlet to the RCID EPCOT