I just walked around building 6 (part of it anyway) and from what I saw I don't think anyone is staying in it right now.Is building 6 still partly open?? It's a month into the renovation I would have expected they close the full building by now
Well that was sweet! Thanks!!I just walked around building 6 (part of it anyway) and from what I saw I don't think anyone is staying in it right now.
I don't think so. I was there at Thanksgiving, and the entire building appeared to be closed and fenced off.Is building 6 still partly open?? It's a month into the renovation I would have expected they close the full building by now
please see post 2. This post will continue to have the most current refurbishment information on it.Going in March standard room.
Which buildings have been finished?
Would like to be near Classic Hall. Which building should I put in room request?
I hope they would be done with it by September, but I guess you never know. I don't know if anyone can give you a real answer this far in advance.With the rate they are going for the refurb what do you think the chances are that the 50's will be done by September?
I didn't know you could see fireworks from the 90's. I've always read about seeing them from the back of the 50's, but not the 90's. That's cool!We had a one-night stay last week before moving to CSR. I requested high floor and 90s and got both. We were in room 8402 and had a great view of the fireworks through the window (we think it was HS). The room was quite clean but our socks were not afternone night, so I suspect there is no mopping between guests. We are at the AOA food court and we were out of the room really early, so I can’t comment on anything but the room. It was nice and clean and made me wonder why I’ve been spending more on deluxe resorts.
Done by September? At the current pace, not a chance. If they continue at the pace they have so far they may be working on their first 50’s building or if all goes well, they may be working in their second 50’s building. So far they’ve taken 8 months to complete the first 4 buildings.With the rate they are going for the refurb what do you think the chances are that the 50's will be done by September?
Done by September? At the current pace, not a chance. If they continue at the pace they have so far they may be working on their first 50’s building or if all goes well, they may be working in their second 50’s building. So far they’ve taken 8 months to complete the first 4 buildings.
I check in Friday fingers and toes crossed!!
The new rooms have a coffeemaker. It includes coffee (maybe tea as well? I only noticed the coffee, lol)/creamer/sugar/etc. Disposable coffee cups are provided.I read there is going to have a kettle in the rooms. Do you need to bring your own coffee/tea/sugar/creamier/cup?
That's what I was thinking. I always request 50's but if it is under construction at that time I will choose somewhere else. I'm fine with taking a non refurbed room but I don't want to be in the area while construction is being done, unless it's building 2, I never stay in that building anyways, lol.
By September I'd anticipate the only non-refurbished rooms would be in the 50's section with construction happening there too. That's my best guess....but it's just a guess.
LOL - thanks!You're guesses tend to be pretty spot on.