Happy to report that the water slide reopened this morning! I was very happy to be the first guest to slide down after the life guard gave it a test run! The kids pirate ship splash area is also very near completion. It has been carefully repainted and some features reassembled. Building 14 has exterior work going on with the walkway blocked approaching the entire right side. This building houses one and two bedroom units and studios. Through lighted windows this evening I could see large equipment in the rooms. I learned from a front desk cast member that the Main Inn building work that was postponed on Tuesday January 26 after it was supposed to begin on the fourth floor the day before, will now start tomorrow, February 5, on the third floor instead. Some clearing of those rooms started today, and that floor will be taken out of inventory till completion. The renovations here are expected to take a little over one year and should be completed by March 2017. The entire Inn Building should be completed first. They couldn't show me a renovated room as many changes have been made to the original model they did have. So, that's all the information I could gather. My five night stay was wonderful. The weather has been so warm and everything has been just lovely here. I'll regretfully be checking out tomorrow and taking 3 flights home to northern New England. Sigh!